SMC RAPTOR-C25 Primary Injection Testing System
SMC RAPTOR-C25 is a high-power primary injection testing system with 13.3 kVA power supporting over 4,000 A current injection.
Product details
| Model | RAPTOR-C25 |
| Manufacturer | SMC |
| Category | Pressure Calibrators |
| Availability | Made to order |
Description
Overview
The SMC RAPTOR-C25 is a high-power primary injection testing system for demanding electrical testing applications requiring sustained currents above 4,000 A. With 13.3 kVA combined power from the master unit and two slave units, the system eliminates the need for multiple turns around the device to reach distant loads, enabling direct high-current testing over typical 3-meter cable distances. The pass-through secondary design with centered hole maintains the same field-proven approach as the RAPTOR-C15 while doubling available power.
The C-25 configuration preserves all core Raptor system features: dynamic output stabilization, detachable touch-screen control console, comprehensive voltage and current measurement, test data storage with USB download, and Ethernet connectivity for remote updates. Pre-configured tests can be customized to meet specific test protocols and results are permanently archived for analysis and compliance documentation.
Key Features
- 13.3 kVA combined power supporting over 4,000 A current injection
- Two slave units included for extended compliance voltage
- Pass-through secondary technique—no external interconnections needed
- Dynamic output stabilization maintains consistent test values
- Detachable touch-screen control console (Raptor HH)
- Variable frequency operation
- Voltage and current measurement inputs
- USB storage and Ethernet LAN connectivity
- Optimized for cable distances around 3 meters
- Expandable—additional slave units achieve up to 15,000 A
Applications
- High-current primary injection testing
- Relay and protective device evaluation
- Current transformer testing
- Recloser and sectionalizer operation verification
- Switchgear and medium-voltage breaker testing
- Transformer heat run and burden analysis
- Ground grid integrity testing over extended distances
Included Accessories
- Master unit
- 2 Slave units
- Raptor HH touch-screen control interface
- Standard accessories set
Specifications
| Configuration | Master unit + 2 Slave units |
| Total Power | 13.3 kVA |
| Master Unit Power | 3 kVA |
| Slave Unit Power (each) | 5 kVA |
| Current Injection Range | Greater than 4,000 A |
| Current Frequency | Variable |
| Weight | 77 lb (35 kg) per unit |
| Portable Features | Integral wheels and handle |
| Optimal Cable Distance | Around 3 meters |
| Control Interface | Detachable touchscreen console (Raptor HH) |
| Data Storage | USB port |
| Connectivity | Ethernet LAN |
| Expandability | Up to 15,000 A with additional slave units |
Request a quote
SMC RAPTOR-C25 Primary Injection Testing System